Komisioning Gardu Induk 70kV dan kubikel 20 kV GI Atapupu, NTT
Komisioning Circuit Breaker 150kV di GI Sei Harapan dan GI Panaran, Batam
Komisioning Gardu Induk 150kV dan kubikel 20 kV di GI Kedung Badak, Bogor
Komisioning Relay Control Panel (RCP) di GI Depok, Jawa Barat
Komisioning MV Panel dan Protection Relay PLTU Tamiyang, Banjarmasin
Komisioning Mobile Substation 150 kV tipe AIS 30MVA di GI Pekalongan, Bengkulu
Komisioning Mobile Substation 150 kV tipe AIS 30MVA di GI Cigareleng, Bandung
Komisioning Protection Relay di GI Betano, Timor Leste
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Payapasir, Medan
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Bekasi, Jawa Barat
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Gandul, Jakarta Selatan
HVDC Test Kabel 33 kV Transformer 3 Power Station 2 Upgrade di GI Indocement
Komisioning Peralatan HV 150 kV Power Station 2 Upgrade di GI Indocement
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Pulodagung, Jakarta
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Garuda Sakti, Pekanbaru
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Tangerang Lama, Tangerang
Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Talang Kelapa, Palembang
Protection Test and Transformer Test at Semen Merah Putih, Ciwandan Plant, Cilegon, 2014
Commissioning of Circuit Breaker 150kV for Line Bay at GI Sei Harapan & GI Sagulung, Batam, 2014
Stability Test Busbar Protection at Indocement Tunggal Perkasa (ITP) Substation, 2014
Commissioning of 2 Capacitor bays at 150kV Cawang Substation, 2014
Re-commissioning of Line bay at 150 kV Bukit Asam Substation, 2014
Commissioning of 150kV Gorda Prima Substation, 2014
Re-commissioning of Transformer bay of GIS 150kV Alam Sutra Substation, 2014
Commissioning of Transformer bay at 150kV Tasik Baru Substation, 2014
Commissioning of 3 extention bays (1 Transformer bay & 2 Line bay) at 150kV GIS Duren Tiga, 2014
Commissioning of 33kV MV Switchgear at PT. Gorda Prima Steelworks, 2014
Commissioning of 2 extention bays (2 Line bay) at 150kV Kedung Badak Substation, 2014
Commissioning of 3 extention bays (1 Bus Coupler & 2 Line bay) at 150kV Tanjung Substation, South Kalimantan, 2015
Commissioning of 2 extention bays (2 Line bay) at 150kV Tenggarong Substation, East Kalimantan, 2015
Commissioning of 3 extention bays (1 Bus Coupler & 2 Line bay) at 150kV Palaran Substation, East Kalimantan, 2015
Testing of Reactor 7 kVar 33kV at PT. Gorda Prima Steelworks, Ciujung
Oil purifying of 2 unit Transformer 45 MVA at Bayah Cement Plant for PT. Sinoma Engineering, 2015
Oil purification at PT. Gorda Steel Work for 7 kVar Reactor, 2015
Commissioning 150 kV Maligi Substation, bay Indoliberty, 2015
Commissioning 150 kV Indoliberty Substation, 2015
Testing of 150 kV Hybrid Substation ABB Pass MO, GIS and Transformer 30/40MVA, 2015 at PT. Suzuki, Cikarang
Commissioning 150 kV Lautan Steel Substation, bay Konsumen, 2015
Commissioning 150 kV PT. Lautan Steel Indonesia Substation, Transformer bay 1, 2015
Commissioning of 150kV GIS and Transformer 45/50MVA at Semen Merah Putih Substation, Bayah, Lebak, Banten, 2015
Commissioning 150 kV ITP Substation, bay Semen Baru 1, Cibinong, 2015
Commissioning of Transformer and MV Switchgear KNNS Cilegon, 2015
Commissioning of 150kV Kota Bangun Substation – Kalimanatan,2015
Commissioning of GIS 150kV Gunung Sahari – Jakarta, 2016
Commissioning of 150kV Indofero Substation, 2016
Commissioning of GE Truck Mounted Power Plant 2 x 25 MW – Lombok, 2016
Commissioning of GE Truck Mounted Power Plant 1 x 25 MW – Nias, 2016
Commissioning of GE Truck Mounted Power Plant 1 x 25 MW – Belitung, 2016
Commissioning of GE Truck Mounted Power Plant 3 x 25 MW – Medan, 2016
Commissioning of GE Truck Mounted Power Plant 3 x 25 MW – Medan, 2016
IBRD S3 Transformer bay GI 150 kV Padang Luar, 2016
IBRD S3 Transformer bay GI 150 kV Kota Pinang, 2016
IBRD S3 Transformer bay GI 150 kV Lubuk Linggau, 2016
IBRD S3 Transformer bay GI 150 kV Simpang Empat- Palembang, 2016
IBRD S3 Transformer bay GI 150 kV Payakumbuh, 2016
IBRD S3 Transformer bay GI 150 kV Lhokseumawe, 2016
IBRD S3 Transformer bay GI 150 kV Kotabumi-Lampung, 2016
IBRD S3 Transformer bay GI 150 kV Prabumulih- Palembang, 2016
IBRD S3 Transformer bay GI 150 kV Baturaja-Palembang, 2016
Line Bay GI Marisa 150kV, Gorontalo, 2016
KNSS Cilegon (HV Test, Relay Protection Test and Stability Test), 2016
Testing and Commissioning of 150kV Punagaya Substation – Makassar, 2017
Testing Commissioning of GIS 150kV Pulogadung – Jakarta, 2017
Individual Test GIS 150kV Kabil Batam – Batam, 2017
Testing and Commissioning Transformer Bay (Extension) at GI 150KV Mantuil – South Kalimantan 2017
Testing and Commissioning Transformer Bay (Extension) at GI 150KV Sampit – Central Kalimantan 2017
Testing and Commissioning Transformer Bay (Extension) at GI 150KV Singkawang – West Kalimantan 2017
Testing and Commissioning Transformer Bay (Extension) at GI 150KV Tri Sakti – South Kalimantan 2017
Testing and Commissioning Transformer Bay (Extension) at GI 150kV Sentul – West Java 2018
Testing and Commissioning Transformer Bay (Extension) at GI 150kV Serang – Banten 2018
Testing and Commissioning Transformer Bay (Extension) at GI 150kV Bungus – West Sumatera 2018
Re-commissioning GIS 150kV Duren Tiga (3 bay) – Jakarta 2018
Testing and Commissioning Transformer Bay (Extension at GI Mantuil – South Kalimantan 2017
Testing and Commissioning IBT4 - GITET 500kV GANDUL – Jakarta 2018
Testing and Commissioning GI 275kv,150kV Lumut Balai - Palembang 2018
Testing and Commissioning GI 150kV Pasar Kemis - Tangerang 2018
Testing and Commissioning Mobile Substation ( Transformer bay) at GI 150kV Jaka Baring - Palembang 2018
Testing and Commissioning Mobile Substation ( Transformer bay) at GI 150kV Lubuk Alung - Padang 2018
Testing and Commissioning Mobile Substation ( Transformer bay) at GI 150kV Sei Mangkei - Sumatera Utara 2018
Testing and Commissioning GI 150kV Grogot - Kalimantan Timur 2018
Testing and Commissioning GI 150kV Tidang Pale – Tana Tidung, Kalimantan Utara 2018
Testing and Commissioning of 150kV and 500kV Muara Tawar Substation - Jakarta 2019
Testing and Commissioning of Transformer bay, 150kV Labutan Substation- NTT 2019
Testing and Commissioning of Transformer bay, 150kV Dompu Substation- NTB 2019
Testing and Commissioning of 2 Lines bay, 150kV Menes Substation – Banten 2019
Testing and Commissioning of 150kV Tanjung Lesung Substation – Banten 2019 m
Testing and Commissioning of 150kV Nganjuk Substation – East Java 2019
Testing and Commissioning of 150kV Gunung Mulia Substation – Banten 2019
Testing and Commissioning of Transformer bay, 150kV Talise Substation- Palu, Central Sulawesi 2019
Testing and Commissioning of Transformer bay, 150kV Poso Substation- Palu, Central Sulawesi 2019
Testing and Commissioning of 150kV Puuwatu Substation – Kendari, South East Sulawesi 2019
Lontar Extension Coal Fire Power Plant 1 x 315 MW at Mauk, Banten 2019
Testing and Commissioning of 150kV Tanjung Pura Substation – North Sumatera 2020
Testing and Commissioning of 150kV Selayang Substation – North Sumatera 2020
Testing and Commissioning of 150kV Tanah Jawa Substation – North Sumatera 2020
Testing and Commissioning of Transformer Bay at 150kV Tegineneng Substation – Sumatera 2020
Testing and Commissioning of Transformer Bay at 150kV Seputih Banyak Substation – Sumatera 2020
Testing and Commissioning of Transformer Bay at 150kV Maninjau Substation – Sumatera 2020
Testing and Commissioning of Transformer Bay at 150kV Sungai Liat Substation – Sumatera 2020
Testing and Commissioning of Transformer Bay at 150kV Rantau Prapat Substation – Sumatera 2020
Rantau Pra[pat Testing and Commissioning of Transformer Bay at 150kV Padanng Industrial Park – Sumatera 2020
Testing and Commissioning of 150kV New Samarinda Substation, East Kalimantan 2020
Testing and Commissioning of 150kV Embalut Substation, East Kalimantan 2020
Stability Test and Intertripping of 2 Line bay GIS 150KV Senayan
Testing and Commissioning of 500kV GISTET Jawa 1 Power Substation, Kerawang West Jawa 2020-2021
Testing and Commissioning of Jawa 1 Power CCPP (PLTGU), Kerawang West Jawa 2020-2021 (On going)
Testing and Commissioning at GIS 150KV Muara Karang Baru-Jakarta 2021 (On going)
Testing and Commissioning at GI 150kV KTT MNA Cilegon(On going)