Pengalaman Kami

1

Komisioning Gardu Induk 70kV dan kubikel 20 kV GI Atapupu, NTT

2

Komisioning Circuit Breaker 150kV di GI Sei Harapan dan GI Panaran, Batam

3

Komisioning Gardu Induk 150kV dan kubikel 20 kV di GI Kedung Badak, Bogor

4

Komisioning Relay Control Panel (RCP) di GI Depok, Jawa Barat

5

Komisioning MV Panel dan Protection Relay PLTU Tamiyang, Banjarmasin

6

Komisioning Mobile Substation 150 kV tipe AIS 30MVA di GI Pekalongan, Bengkulu

7

Komisioning Mobile Substation 150 kV tipe AIS 30MVA di GI Cigareleng, Bandung

8

Komisioning Protection Relay di GI Betano, Timor Leste

9

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Payapasir, Medan

10

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Bekasi, Jawa Barat

11

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Gandul, Jakarta Selatan

12

HVDC Test Kabel 33 kV Transformer 3 Power Station 2 Upgrade di GI Indocement

13

Komisioning Peralatan HV 150 kV Power Station 2 Upgrade di GI Indocement

14

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Pulodagung, Jakarta

15

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Garuda Sakti, Pekanbaru

16

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Tangerang Lama, Tangerang

17

Komisioning Mobile Substation 150 kV tipe GIS 30MVA di GI Talang Kelapa, Palembang

18

Protection Test and Transformer Test at Semen Merah Putih, Ciwandan Plant, Cilegon, 2014

19

Commissioning of Circuit Breaker 150kV for Line Bay at GI Sei Harapan & GI Sagulung, Batam, 2014

20

Stability Test Busbar Protection at Indocement Tunggal Perkasa (ITP) Substation, 2014

21

Commissioning of 2 Capacitor bays at 150kV Cawang Substation, 2014

22

Re-commissioning of Line bay at 150 kV Bukit Asam Substation, 2014

23

Commissioning of 150kV Gorda Prima Substation, 2014

24

Re-commissioning of Transformer bay of GIS 150kV Alam Sutra Substation, 2014

25

Commissioning of Transformer bay at 150kV Tasik Baru Substation, 2014

26

Commissioning of 3 extention bays (1 Transformer bay & 2 Line bay) at 150kV GIS Duren Tiga, 2014

27

Commissioning of 33kV MV Switchgear at PT. Gorda Prima Steelworks, 2014

28

Commissioning of 2 extention bays (2 Line bay) at 150kV Kedung Badak Substation, 2014

29

Commissioning of 3 extention bays (1 Bus Coupler & 2 Line bay) at 150kV Tanjung Substation, South Kalimantan, 2015

30

Commissioning of 2 extention bays (2 Line bay) at 150kV Tenggarong Substation, East Kalimantan, 2015

31

Commissioning of 3 extention bays (1 Bus Coupler & 2 Line bay) at 150kV Palaran Substation, East Kalimantan, 2015

32

Testing of Reactor 7 kVar 33kV at PT. Gorda Prima Steelworks, Ciujung

33

Oil purifying of 2 unit Transformer 45 MVA at Bayah Cement Plant for PT. Sinoma Engineering, 2015

34

Oil purification at PT. Gorda Steel Work for 7 kVar Reactor, 2015

35

Commissioning 150 kV Maligi Substation, bay Indoliberty, 2015

36

Commissioning 150 kV Indoliberty Substation, 2015

37

Testing of 150 kV Hybrid Substation ABB Pass MO, GIS and Transformer 30/40MVA, 2015 at PT. Suzuki, Cikarang

38

Commissioning 150 kV Lautan Steel Substation, bay Konsumen, 2015

39

Commissioning 150 kV PT. Lautan Steel Indonesia Substation, Transformer bay 1, 2015

40

Commissioning of 150kV GIS and Transformer 45/50MVA at Semen Merah Putih Substation, Bayah, Lebak, Banten, 2015

41

Commissioning 150 kV ITP Substation, bay Semen Baru 1, Cibinong, 2015

42

Commissioning of Transformer and MV Switchgear KNNS Cilegon, 2015

43

Commissioning of 150kV Kota Bangun Substation – Kalimanatan,2015

44

Commissioning of GIS 150kV Gunung Sahari – Jakarta, 2016

45

Commissioning of 150kV Indofero Substation, 2016

46

Commissioning of GE Truck Mounted Power Plant 2 x 25 MW – Lombok, 2016

47

Commissioning of GE Truck Mounted Power Plant 1 x 25 MW – Nias, 2016

48

Commissioning of GE Truck Mounted Power Plant 1 x 25 MW – Belitung, 2016

49

Commissioning of GE Truck Mounted Power Plant 3 x 25 MW – Medan, 2016

50

Commissioning of GE Truck Mounted Power Plant 3 x 25 MW – Medan, 2016

51

IBRD S3 Transformer bay GI 150 kV Padang Luar, 2016

52

IBRD S3 Transformer bay GI 150 kV Kota Pinang, 2016

53

IBRD S3 Transformer bay GI 150 kV Lubuk Linggau, 2016

54

IBRD S3 Transformer bay GI 150 kV Simpang Empat- Palembang, 2016

55

IBRD S3 Transformer bay GI 150 kV Payakumbuh, 2016

56

IBRD S3 Transformer bay GI 150 kV Lhokseumawe, 2016

57

IBRD S3 Transformer bay GI 150 kV Kotabumi-Lampung, 2016

58

IBRD S3 Transformer bay GI 150 kV Prabumulih- Palembang, 2016

59

IBRD S3 Transformer bay GI 150 kV Baturaja-Palembang, 2016

60

Line Bay GI Marisa 150kV, Gorontalo, 2016

61

KNSS Cilegon (HV Test, Relay Protection Test and Stability Test), 2016

62

Testing and Commissioning of 150kV Punagaya Substation – Makassar, 2017

63

Testing Commissioning of GIS 150kV Pulogadung – Jakarta, 2017

64

Individual Test GIS 150kV Kabil Batam – Batam, 2017

65

Testing and Commissioning Transformer Bay (Extension) at GI 150KV Mantuil – South Kalimantan 2017

66

Testing and Commissioning Transformer Bay (Extension) at GI 150KV Sampit – Central Kalimantan 2017

67

Testing and Commissioning Transformer Bay (Extension) at GI 150KV Singkawang – West Kalimantan 2017

68

Testing and Commissioning Transformer Bay (Extension) at GI 150KV Tri Sakti – South Kalimantan 2017

69

Testing and Commissioning Transformer Bay (Extension) at GI 150kV Sentul – West Java 2018

70

Testing and Commissioning Transformer Bay (Extension) at GI 150kV Serang – Banten 2018

71

Testing and Commissioning Transformer Bay (Extension) at GI 150kV Bungus – West Sumatera 2018

72

Re-commissioning GIS 150kV Duren Tiga (3 bay) – Jakarta 2018

73

Testing and Commissioning Transformer Bay (Extension at GI Mantuil – South Kalimantan 2017

74

Testing and Commissioning IBT4 - GITET 500kV GANDUL – Jakarta 2018

75

Testing and Commissioning GI 275kv,150kV Lumut Balai - Palembang 2018

76

Testing and Commissioning GI 150kV Pasar Kemis - Tangerang 2018

77

Testing and Commissioning Mobile Substation ( Transformer bay) at GI 150kV Jaka Baring - Palembang 2018

78

Testing and Commissioning Mobile Substation ( Transformer bay) at GI 150kV Lubuk Alung - Padang 2018

79

Testing and Commissioning Mobile Substation ( Transformer bay) at GI 150kV Sei Mangkei - Sumatera Utara 2018

80

Testing and Commissioning GI 150kV Grogot - Kalimantan Timur 2018

81

Testing and Commissioning GI 150kV Tidang Pale – Tana Tidung, Kalimantan Utara 2018

82

Testing and Commissioning of 150kV and 500kV Muara Tawar Substation - Jakarta 2019

83

Testing and Commissioning of Transformer bay, 150kV Labutan Substation- NTT 2019

84

Testing and Commissioning of Transformer bay, 150kV Dompu Substation- NTB 2019

85

Testing and Commissioning of 2 Lines bay, 150kV Menes Substation – Banten 2019

86

Testing and Commissioning of 150kV Tanjung Lesung Substation – Banten 2019 m

87

Testing and Commissioning of 150kV Nganjuk Substation – East Java 2019

88

Testing and Commissioning of 150kV Gunung Mulia Substation – Banten 2019

89

Testing and Commissioning of Transformer bay, 150kV Talise Substation- Palu, Central Sulawesi 2019

90

Testing and Commissioning of Transformer bay, 150kV Poso Substation- Palu, Central Sulawesi 2019

91

Testing and Commissioning of 150kV Puuwatu Substation – Kendari, South East Sulawesi 2019

92

Lontar Extension Coal Fire Power Plant 1 x 315 MW at Mauk, Banten 2019

93

Testing and Commissioning of 150kV Tanjung Pura Substation – North Sumatera 2020

94

Testing and Commissioning of 150kV Selayang Substation – North Sumatera 2020

95

Testing and Commissioning of 150kV Tanah Jawa Substation – North Sumatera 2020

96

Testing and Commissioning of Transformer Bay at 150kV Tegineneng Substation – Sumatera 2020

97

Testing and Commissioning of Transformer Bay at 150kV Seputih Banyak Substation – Sumatera 2020

98

Testing and Commissioning of Transformer Bay at 150kV Maninjau Substation – Sumatera 2020

99

Testing and Commissioning of Transformer Bay at 150kV Sungai Liat Substation – Sumatera 2020

100

Testing and Commissioning of Transformer Bay at 150kV Rantau Prapat Substation – Sumatera 2020

101

Rantau Pra[pat Testing and Commissioning of Transformer Bay at 150kV Padanng Industrial Park – Sumatera 2020

102

Testing and Commissioning of 150kV New Samarinda Substation, East Kalimantan 2020

103

Testing and Commissioning of 150kV Embalut Substation, East Kalimantan 2020

104

Stability Test and Intertripping of 2 Line bay GIS 150KV Senayan

105

Testing and Commissioning of 500kV GISTET Jawa 1 Power Substation, Kerawang West Jawa 2020-2021

106

Testing and Commissioning of Jawa 1 Power CCPP (PLTGU), Kerawang West Jawa 2020-2021 (On going)

107

Testing and Commissioning at GIS 150KV Muara Karang Baru-Jakarta 2021 (On going)

108

Testing and Commissioning at GI 150kV KTT MNA Cilegon(On going)

109

Others

© Copyright 2013 PT HEKSAADITAMA - All Rights Reserved

EN